Please find below information relating to HS2 in Hale Barns, that you might find relevant and interesting
Here is the link to page 180 which is for the Warburton Green area:
S107.pdf (publishing.service.gov.uk)
Volume 5 docs, which is the Volume 5 ESA for traffic and transport:
PDF’s for the MA06 map book too CT-05-356 - Hulesheath to Manchester:
The pages you will need for our area in the above document are as follows:
Page 79 - Hybrid Bill design construction phase
Page 80 - AP2 construction phase
Page 81 - Hybrid Bill post construction
Page 82 - AP2 post construction
Construction compounds in the Hale Barns area
There would be six construction compounds in the Hale Barns area during construction of the Proposed Scheme:
• M56 River Bollin satellite compound;
• River Bollin East viaduct satellite compound;
• Sunbank Lane satellite compound;
• M56 East satellite compound;
• Manchester Airport High Speed station south satellite compound; and
• Manchester Airport High Speed station main compound.
The location of these compounds is shown on maps CT-05-356-L1, CT-05-356 and CT-05-357a in the Volume 2 Community Area Map Book for MA06 Hulseheath to Manchester Airport in the SES2 and AP2 ES. (Which you can find in the link below)
The CT-05 Map book for MA06 is here as follows:
Use the content button on the top left of the page, once you have clicked the above link, and look for the following pages:
S20 79
S20 80
S20 81
S20 82
S20 84
S20 96
S20 98
Construction routes in the Hale Barns area
The routes taken by construction traffic accessing the compounds in the Hale Barns area (TR-08-311 in the Volume 5 Map Book: Traffic and transport in the SES2 and AP2 ES): HS2 Crewe - Manchester SES2 and AP2 ES Navigator (arcgis.com) community area MA06 covers Hale Barns and Warburton Green area.
Youtube
Please see the YouTube video by one of our residents, who has driven the route that the HS2 HGVs would be going down, as well as down Longsides. The video is 10 minutes long and is very detailed.